Residue fired power and heating station Linz – Linz (AT)

Operator
Municipal energy supplier.
Fuel
Industrial and municipal residues, sewage sludge.
Features
bubbling fluidized bed combustion system with tailend boiler.
Extent of order
Lot 1: Waste incineration plant with bubbling fluidized bed technology Linz for combined heat and power production – personal reference of Dr. Steer
Technical Data
| Thermal firing capacity | 66 MW |
| Steam production | 82 t/h |
| Lower heating value (min. – max.) | 7,0 – 18,0 MJ/kg |
| Steam temperature | 435 °C |
| Design pressure | 40 bar |
| Year of commissioning | 2011 |




